Why is Prosper Portland doing this project?
After 120 years of continuous operation, Union Station requires critical [...]
After 120 years of continuous operation, Union Station requires critical [...]
As part of the environmental review, Prosper Portland, ODOT and [...]
We currently only have funds to complete the 30% Preliminary [...]
The main concourse is a significant historic feature. We are [...]
The proposed plan converts the existing ticket counter into a [...]
Due to the extensive nature of the proposed upgrades that [...]
Amtrak passenger service will remain operational during construction. However, there [...]
The existing canopies do not meet current seismic and structural [...]
Sign up to get on our email list and get [...]
The Long Range Plan is forecasting the number of passenger [...]